What does semi-finished mean?
What you receive from the developer, and what to check before you pay for finishing.
The terms you will hear
Semi-finished: the unit is handed over with plaster on walls and ceilings, electrical and plumbing first fix without final fittings, and usually aluminium windows and an entrance door. No flooring, paint, tiling or appliances. This is the most common handover in the compounds of the Fifth Settlement, Sheikh Zayed and Madinaty.
On plaster: close to semi-finished, but sometimes without a complete electrical and plumbing first fix. Ask the developer precisely what first fix exists and how far it goes.
Red brick: walls built without plaster. First fix and plaster are on you, which gives more freedom to change the layout but costs more at the start.
Core and shell: common in villas and commercial units. Structure and external walls only, sometimes without internal walls. The interior layout and design are done from scratch.
Super lux and ultra lux: marketing terms, not specifications. One developer’s super lux can be below another’s lux. What defines the level is the written brands and sizes, not the name.
What you actually receive
In most semi-finished handovers you receive plastered walls and ceilings, electrical first fix with conduits and boxes with or without wiring depending on the developer, plumbing first fix for supply and drainage, aluminium windows, an entrance door, and sometimes air-conditioning first fix. Ask the developer for the handover specification that states exactly what is included.
What you do not receive: flooring, bathroom and kitchen tiling, paint, interior doors, sanitary ware, a kitchen, lighting, and any gypsum or decorative work. All of that is what goes into the finishing quotation.
Handover checklist
- Plaster levels on walls and ceilings, especially corners and the wardrobe and kitchen positions, because any deviation shows at installation.
- Electrical first fix: number and positions of points against the drawing, the distribution board location, and air-conditioning pipework if included.
- Plumbing first fix: a pressure test on supply pipes, and drainage falls in bathrooms, kitchen and terrace.
- Waterproofing: bathrooms, kitchen, terraces and the roof in villas. This is the most important and most forgotten item, because fixing it after tiling means demolition.
- Aluminium and the door: closing, gaskets, sizes, and any cracks or scratches.
- Area: take the actual measurements and compare them with the contract area. The quotation must be written on the actual net area.
- Photograph everything before you sign the handover record, and write your remarks in the record itself.
The mistakes that cost
- Signing a handover record without remarks, then discovering drainage falls or missing first fix. After signing, the repair is on you.
- Starting tiling before the pressure test and waterproofing. Any leak afterwards means demolition and redoing.
- Relying on a single rate per square metre. The rate changes with the state of the unit and the materials; what protects you is an itemised quotation by brand, size and quantity.
- Changing the design after execution starts without a written change order. Every change must be written with its price and its effect on the schedule before it is executed.
- Paying a large share up front. Healthy payment is staged, each payment after its stage is handed over with a photo report.
What determines the cost of finishing
The state of the unit at handover (whether first fix or waterproofing needs repair), the net area, the level of materials (flooring, bathrooms, doors, paint), gypsum and lighting, woodwork, kitchen and dressing room, and finally labour and supervision.
That is why there is no single correct number for all apartments. The right way: a site visit and measurements, then a written quotation on the state of your unit, then you compare and decide.
Handover questions
What people ask about semi-finished units.
What exactly does semi-finished mean?
The unit is handed over with plaster, electrical and plumbing first fix, aluminium and an entrance door, without flooring, paint, tiling or appliances. Details differ between developers, so ask for the handover specification.
What is the difference between semi-finished and on plaster?
They are close. On plaster is sometimes without electrical and plumbing first fix, so confirm with the developer exactly what exists.
What should I do as soon as I receive the unit?
Check plaster, first fix, waterproofing and aluminium, photograph everything, and write your remarks in the handover record before signing. If unsure, an engineer from our team inspects with you and writes a photo handover report.
How long does finishing from semi-finished take?
It depends on the area, the finishing level and the state of the first fix. The schedule is written in the quotation stage by stage, and you hand over each stage before the next.
Can I start finishing before the compound hands over the utilities?
In many compounds finishing is allowed with an access permit and rules on working hours and waste removal. We deal with the compound management on this and it is written into the schedule.
How do I request a quotation from Zavora?
Send on WhatsApp the area, the size, the handover state and photos if available. An engineer books a site visit, then you receive a written itemised quotation.