How is the cost of finishing determined?
The factors behind the real finishing figure, and why a written quotation matters more than any rate per metre.
Why a single rate per metre misleads
The first question is always: how much is finishing per square metre? The honest answer is that no single figure fits every unit. A rate per metre is an average that hides different items, so an apartment with more bathrooms is not the same as one of the same size with a single bathroom, and a unit whose first fix needs repair is not the same as one whose first fix is sound.
Most offers quoted per metre also come without detail. They state a general level such as lux or super lux, with no brand, size or grade, which makes comparing two offers almost impossible and opens the door to additions during execution.
The rate given over the phone is also usually calculated on the gross contract area, not on the surfaces that will actually be finished, so the final figure can change after the site visit even if the level stays the same.
The starting point: the state of the unit
- Semi-finished: plaster and first fix are in place, and the cost usually starts from flooring, bathrooms and paint. Make sure first that the first fix and waterproofing are sound, because any repair to them adds to the total.
- Red brick: plaster and first fix are part of the calculation, so the cost starts at an earlier stage, but you have more room to change the layout and place points.
- Core and shell, or a villa on more than one floor: the internal layout, stairs, terraces, roof and their waterproofing are items with their own quantities, and none of them shows in a standard apartment rate per metre, and pricing here is usually based on architectural and construction drawings, not on the area alone.
- An older apartment for renovation: there is demolition and waste removal, and often replacement of old first fix. Ask how anything uncovered after demolition will be priced.
Area: the net area, not the contract figure
The area in the contract is usually gross, and includes walls and a share of common parts. Finishing is done on the actual floor and walls, so the right calculation starts with real measurements on site.
Each item has its own area: flooring by floor area, paint by wall and ceiling area, and tiling by the walls of bathrooms and kitchen, and gypsum by the ceilings that receive work. That is why two apartments of the same size can differ depending on ceiling height and the number of bathrooms.
Make sure the quantity is written next to each item, in metres or units, and that any lump-sum item states exactly what it covers.
Items and level of materials
- The main items are usually: completing the first fix and air conditioning, waterproofing, flooring, bathrooms and kitchen, paint, gypsum and lighting, and doors and woodwork. Labour and supervision do not show in photos, but they decide whether an expensive material looks expensive.
- Brand and origin: the same type of porcelain, sanitary ware or paint varies widely in price between brands and between local and imported, so the word porcelain on its own in an offer is not enough.
- Size and grade: large-format tiles need a flatter floor and more precise labour, and second grade can vary in colour or size. Both affect labour and wastage, not only the price of the material, and wastage also varies with the laying pattern, straight or diagonal.
- Balance: not every item has to be at the same level. You can raise the level of what is touched every day, such as flooring and sanitary ware, and avoid saving on waterproofing and first fix, because repairing them later means demolition.
How to reach a real figure for your unit
- Start with a site visit and actual measurements, with an inspection of the first fix, waterproofing and plaster, and photos of the current state as a reference.
- Decide the level you want for each item, and if you need a design, let it come before the pricing, because decisions made on site are usually the most expensive ones.
- Ask for a written itemised quotation by brand, size and quantity, and ask plainly what is not included, such as appliances, air-conditioning units and curtains.
- Compare offers on the same items and specifications, not on the total figure, and put any change in writing with its price before it is carried out.
Cost questions
What people ask about finishing cost.
How much is finishing per square metre?
There is no single correct figure, because the rate changes with the state of the unit, the net area and the level of materials. The real figure comes from a written quotation after a site visit.
Why do two offers for the same apartment differ so much?
Usually because they are not pricing the same thing, such as a different brand or grade, or an item like waterproofing left out. Compare the items and specifications before the figure.
Can I save without lowering quality?
Yes, by balancing the items and fixing the design before starting. Do not save on waterproofing and first fix, because repairing them later means demolition.
What should a quotation include?
Every item with its description, brand, size, quantity and unit price, and what is not included in the offer.
How do I request a quotation from Zavora?
Send on WhatsApp the area, the size and the state of the unit. An engineer books a site visit, then you receive a written itemised quotation by brand, size and quantity.