Finishing

Finishing, handed over item by item.

New Cairo (Fifth Settlement), Sheikh Zayed, Madinaty, El Shorouk, Heliopolis.

What we offer

Three ways to start.

01

Complete finishing

From first fix to the last coat of paint, by the team that designed it. Photographs before any wall is closed, water and pressure tests, and a photo report every week.

What you receive

  • Itemised quotation by brand, size and quantity
  • Written schedule
  • Item-by-item handover with a written warranty
Talk about my unit
02

Semi-finished and handover units

We check what the developer handed over before anything starts: plaster, first fix, waterproofing, aluminium. What is sound stays. What is not is written in the quotation.

What you receive

  • Handover inspection report with photographs
  • Quotation that separates repair from finishing
  • Any change after signing by written variation order
Check my unit's handover
03

Villas and compounds

Villas and townhouses in the compounds of New Cairo, Sheikh Zayed and Madinaty: finishing, landscape and woodwork resolved as one project, with one engineer responsible.

What you receive

  • One contract for interiors, landscape and woodwork
  • 3D visuals before execution
  • Site visits with photo reports
Talk about my villa

Before any number

What we check during the site visit.

01

Plaster and first fix

We check wall and ceiling levels, the electrical and plumbing first fix the developer handed over, and the air-conditioning pipework and positions. What is sound stays as it is and you do not pay for it twice; what is missing or non-compliant is written as a separate priced item in the quotation.

02

Waterproofing and drainage

Bathrooms, kitchens and terraces are checked with waterproofing and a pressure test on the pipes before any tiling. In villas we also check the roof, drainage and levels, because a mistake there shows a year later, not before.

03

Aluminium and doors

The developer’s windows and the apartment doors are checked for closing, sealing and size. If they will be replaced they are written by size and type; if they stay, they are scheduled so they are not used before painting.

04

Net area

The quotation is written on the actual area we measured during the visit, not the developer’s contract area. This is stated on the first page of the quotation so there is no gap between the agreed number and the number you pay.

How we work

Five stages. Each one is handed over before the next.

  1. 01

    Site visit

    An engineer visits, measures and checks what was handed over.

  2. 02

    Quotation

    Itemised by brand, size and quantity, with a written schedule.

  3. 03

    Contract and design

    3D visuals, material selection and working drawings.

  4. 04

    Execution

    Photographs before any wall is closed. Weekly photo report.

  5. 05

    Handover and warranty

    Item by item, with a snag list and a written warranty.

Where we work

Five areas. One team.

  • New Cairo (Fifth Settlement)
  • Sheikh Zayed
  • Madinaty
  • El Shorouk
  • Heliopolis

Reach us

WhatsApp first.

Send the area, the unit size and its current state, and we reply during working hours.

010 5511 6637 · Saturday to Thursday, 10 am to 6 pm. Friday closed.

Finishing questions

What people ask before signing.

Where does finishing a semi-finished apartment start?

With an inspection of what the developer handed over: plaster, electrical, plumbing, waterproofing, aluminium. After the inspection you receive a photo handover report and a quotation that separates repair items from finishing items, and you decide what to complete and when.

Is there a price per square metre?

No. The rate changes with the state of the unit, the materials and the finishing level, and one number for everything is misleading. What we provide is a written quotation on your unit by brand, size and quantity, with the labour cost fixed once you sign.

How do payments work?

A contract payment with a receipt, then each payment after you hand over its stage with a photo report. The final payment comes after final handover with a written snag list.

Who chooses the materials and where do they come from?

You choose from samples we present during the design stage, and every material is written in the quotation by brand and model. Supply is on us according to the quotation, and any change after signing goes through a written change order.

Is the 3D design included in the finishing contract?

Yes. The 3D design and the shop drawings are part of the finishing contract, and you approve them before any work starts on site.

How is the work handed over?

Item by item. Each stage is handed over before the next with a photo report, and final handover comes with a written record and a written warranty on the works in the contract.

Do you work inside compounds?

Yes, in the compounds of the Fifth Settlement, Sheikh Zayed, Madinaty, Shorouk and Heliopolis. We handle the compound requirements for access permits, working hours and waste removal, and these are written into the schedule.

Start with a site visit.

An engineer visits, measures, and you receive a written itemised quotation.

WhatsAppCallServices